Sadyt|Newsroom|Lasts news

Last news

Total Result: 34
4
3
2
1
1 4
Cabezón de la Sal
25/10/2016
Sacyr Construcción and Sadyt have been awarded the contract for project design and construction of the Ibiza Wastewater Treatment Plant for a value of 24,6 million euros
 
Valoriza Agua
14/10/2016
Sacyr and Valoriza sign an agreement with the University of Chile for the treatment of acid water from mining


 
Cabezón de la Sal
16/11/2015
Sadyt has been awarded the contract for a New Sludge Thickening System by Centrifuges in The Gavia Waste Water Treatment Plant (WWTP), Madrid


 
Cabezón de la Sal
23/10/2015
Sadyt has been awarded the contract for executing the Expansion of the Water Treatment Plant in Lebrija, (Sevilla)

Sadyt will execute the project, engineering, supply, installation and commissioning

 
Cabezón de la Sal
14/10/2015
Sadyt–CHM Joint Venture has been awarded the O&M and Additional Works of the “Marina Baja”, Mutxamel SWRO Desalt Plant

The desalination plant produces 50.000 m3/day of desalted water

 
Cabezón de la Sal
10/04/2015
Sadyt has been awarded the contract of Engineering, Procurement and Upgrading of the Formentera Seawater Desalination Plant, included the O&M for 13 years



 
Cabezón de la Sal
01/04/2015
Sadyt has been awarded the operation and maintenance services of the drinking water treatment plant of Jaca



 
Cabezón de la Sal
13/03/2015
Sadyt has been awarded the O&M services of four waste water treatmen plants in Asturias, Spain.



 
Cabezón de la Sal
15/02/2015
Sadyt celebrates its 20th anniversary


 
Cabezón de la Sal
07/01/2015
IMDEA Agua, Sadyt and Valoriza Agua cooperate with the development of the R&D LIFE+ PROYECT, TRANSFOMEM


Total Result: 34
4
3
2
1
1 4